Skip to content
Giannola Construction Services Logo Giannola Construction Services Logo
  • HOME
  • SERVICES
    • RESIDENTIAL
      • NEW CONSTRUCTION PROCESS
      • REMODEL PROCESS
    • COMMERCIAL
      • COMMERCIAL PROCESS
    • ROOFING
      • ROOFING PROCESS
    • DESIGN LOFT
  • PORTFOLIO
  • ABOUT
    • WHO WE ARE
    • BLOG
    • AWARDS
    • IN THE NEWS
  • CONTACT US
    • CAREERS
  • GET A FREE QUOTE

FAQs

  • Step 4 – Finishing Touches and Completion

    Step 4 – Finishing Touches and Completion

    AshiaSSwebsites-May 22nd, 2024-

    Get building permit Have dumper and material delivered the day of the build Protect lawn, porches, decks, and patios Remove old materials Inspect existing wood decking Install Ice & Water Shield to match or exceed building code Install new roofing materials Clean up

  • Step 3 – Create your Vision

    Step 3 – Create your Vision

    AshiaSSwebsites-May 22nd, 2024-

    Use inspection report Our photo report As well as aerial CAD technology -This is then upload into our CRM and build an estimate based off local material and labor pricing Present to you to go over and select material and color

  • Step 2 – Final Approvals and Plans

    Step 2 – Final Approvals and Plans

    AshiaSSwebsites-May 22nd, 2024-

    Use our damage inspection report Our photo report As well as aerial CAD technology, a 3 rd party measuring system to help build an accurate detailed estimate -This uses a current local database to estimate all the damages and repairs needed for the property

  • Step 1 – Initial and Preliminary Plans

    Step 1 – Initial and Preliminary Plans

    AshiaSSwebsites-May 22nd, 2024-

    Start inspection from the ground We check all aspects of the building, not just the roof Examine the roofing material Look for storm related damage as well as general wear-&-tear Take 15 – 30 Photos of the house Explain the entire situation to you

  • Step 5 – Warranty

    Step 5 – Warranty

    AshiaSSwebsites-May 22nd, 2024-

    One-Year Walkthrough Punch List Final Completion 5 Year Warranty

  • Step 4 – Finishing Touches and Completion

    Step 4 – Finishing Touches and Completion

    AshiaSSwebsites-May 22nd, 2024-

    Walkthrough Touch-Ups and Punch List Final Inspection Financial Closings Obtain Your Keys and Move In!

  • Step 3 – Create your Vision

    Step 3 – Create your Vision

    AshiaSSwebsites-May 22nd, 2024-

    Site-Work & Foundations Framing Rough Mechanical, Electrical, & Plumbing (MEP) Rough Inspections Insulation and Drywall Interiors: Trim, Paint, and Coverings Final Mechanical, Electrical, & Plumbing (MEP)

  • Step 2 – Final Approvals and Plans

    Step 2 – Final Approvals and Plans

    AshiaSSwebsites-May 22nd, 2024-

    Review and Make Necessary Revisions. Approve Final Architectural Plans. Review and Update Budget. Authorize Final Architectural Plans. Setup your BuilderTrend account to monitor progress

  • Step 1 – Initial Meeting and Preliminary Plans

    Step 1 – Initial Meeting and Preliminary Plans

    AshiaSSwebsites-May 22nd, 2024-

    Planning the preliminary drawings. Discuss Lifestyle Needs. Discuss Budget. Architectural Planning. Preliminary Design Meeting with Design Team. Build Cost Estimate.

  • Step 4 – Finishing Touches and Completion

    Step 4 – Finishing Touches and Completion

    AshiaSSwebsites-May 22nd, 2024-

    Walkthrough Touch-Ups and Punch List Final Inspection

12Next
giannola



the design loft

Contact Info

515 Ship Street Suite 205 St. Joseph MI, 49085

Phone: 1-269-408-1500

Email: kg@giannolaconstruction.com

FIND US

© Copyright 2026 All Rights Reserved | Site designed by JLN Studio | Developed by SS | Powered by WordPress | Privacy Policy
Page load link
Go to Top